In order to solve the problem that the simulation model is not universal, based on the method of module and data separation, we designed universal modules which is delaminated and can be expanded. Then, the simulation data management system is designed for data storage and the management of experimental parameters. At last, the simulation method is designed and verified by the temperature controlling of Industrial formaldehyde purification tower. This method realizes the separation of data and experiment, the unified management of data, and can effectively improve the generalization and the redevelopment of the simulation model, can be used in the simulation of industrial measurement and controlling.
|