10 July 2018 Lessons learned in extended-extended Spitzer Space Telescope operations
Lisa J. Storrie-Lombardi, Bolinda E. Kahr, Joseph C. Hunt, Sean Carey, Carson Lee Bennett, Nancy Silbermann, Elena Scire, William A. Mahoney, Patrick Lowrance
Author Affiliations +
Abstract
The Spitzer Space Telescope is executing the ninth year of extended operations beyond its 5.5-year prime mission. The project anticipated a maximum extended mission of about four years when the first mission extension was proposed. The robustness of the observatory hardware and the creativity of the project engineers and scientists in overcoming hurdles to operations has enabled a substantially longer mission lifetime. This has led to more challenges with an aging groundsystem due to resource reductions and decisions made early in the extended mission based on a shorter planned lifetime. We provide an overview of the extended mission phases, challenges met in maintaining and enhancing the science productivity, and what we would have done differently if the extended mission was planned from the start to be nearly twice as long as the prime mission.
Conference Presentation
© (2018) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Lisa J. Storrie-Lombardi, Bolinda E. Kahr, Joseph C. Hunt, Sean Carey, Carson Lee Bennett, Nancy Silbermann, Elena Scire, William A. Mahoney, and Patrick Lowrance "Lessons learned in extended-extended Spitzer Space Telescope operations", Proc. SPIE 10704, Observatory Operations: Strategies, Processes, and Systems VII, 107041D (10 July 2018); https://doi.org/10.1117/12.2314116
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Observatories

Space operations

Space telescopes

Exoplanets

Space observatories

Astronomy

Astrophysics

RELATED CONTENT


Back to Top