You have requested a machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Neither SPIE nor the owners and publishers of the content make, and they explicitly disclaim, any express or implied representations or warranties of any kind, including, without limitation, representations and warranties as to the functionality of the translation feature or the accuracy or completeness of the translations.
Translations are not retained in our system. Your use of this feature and the translations is subject to all use restrictions contained in the Terms and Conditions of Use of the SPIE website.
3 July 1998Integrated logistic support applied to the GTC maintenance and operations
The support costs of a system during the operational phase of its life-cycle represent a substantial part of the total life-cycle cost. Also, the support costs strongly depend on the decisions taken during the initial stages of the system design. However, traditionally many major systems have been developed attending only to the criteria deriving from the main functions of the system concerned. Questions related to logistic support were taken into account a posteriori, when the system was about to start the operational phase. Hence, the life-cycle costs were much bigger than initially foreseen, and at the same time, the maintenance and operation of the system suffered from inefficiency. This problem is further exacerbated as the complexity of the system increases. In the light of these considerations, it is obvious that the development of the Gran Telescopio Canarias (GTC) has to be considered as an integral concept that takes into account not only the scientific but also the logistic-support requirements. Such a compromise requires logistic support to be considered at all the phase of the life-cycle of the system, especially in those design stages in which the main decisions affecting the configuration of the system are taken. This paper presents the integrated logistic support (ILS) approach that will be followed to design the GTC in such a way as to make it effectively and economically supportable, as well as to develop the necessary elements for supporting it. A goal is to reach an optimum compromise between the cost of designing the GTC, including the support elements, and the cost of the support itself. Also, the logistic-support analysis will lead to the plan for the GTC operation and maintenance.
The alert did not successfully save. Please try again later.
Juan Paris P. Gonzalez, "Integrated logistic support applied to the GTC maintenance and operations," Proc. SPIE 3349, Observatory Operations to Optimize Scientific Return, (3 July 1998); https://doi.org/10.1117/12.316505