Paper
26 May 1998 Green Bank Telescope active surface system
Richard J. Lacasse
Author Affiliations +
Abstract
During the design phase of the Green Bank Telescope (GBT), various means of providing an accurate surface on a large aperture paraboloid, were considered. Automated jacks supporting the primary reflector were selected as the appropriate technology since they promised greater performance and potentially lower costs than a homologous or carbon fiber design, and had certain advantages over an active secondary. The design of the active surface has presented many challenges. Since the actuators are mounted on a tipping structure, it was required that they support a significant side-load. Such devices were not readily available commercially so they had to be developed. Additional actuator requirements include low backlash, repeatable positioning, and an operational life of at least 230 years. Similarly, no control system capable of controlling the 2209 actuators was commercially available. Again a prime requirement was reliability. Maintaining was also a very important consideration. The system architecture is tree-like. An active surface 'master-computer' controls interaction with the telescope control system, and controls ancillary equipment such as power supplies and temperature monitors. Two slave computers interface with the master- computer, and each closes approximately 1100 position loops. For simplicity, the servo is an 'on/off' type, yet achieves a positioning resolution of 25 microns. Each slave computer interfaces with 4 VME I/O cards, which in turn communicate with 140 control modules. The control modules read out the positions of the actuators every 0.1 sec and control the actuators' DC motors. Initial control of the active surface will be based on an elevation dependant structural model. Later, the model will be improved by holographic observations.Surface accuracy will be improved further by using laser ranging system which will actively measure the surface figure. Several tests have been conducted to assure that the system will perform as desired when installed on the telescope. These include actuator life tests, motor life test, position transducer accuracy test, as well as positioning accuracy tests.
© (1998) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Richard J. Lacasse "Green Bank Telescope active surface system", Proc. SPIE 3351, Telescope Control Systems III, (26 May 1998); https://doi.org/10.1117/12.308802
Lens.org Logo
CITATIONS
Cited by 7 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Actuators

Control systems

Telescopes

Computing systems

Ranging

Laser systems engineering

Electronics

RELATED CONTENT

Emulator for the W. M. Keck 10-m telescope
Proceedings of SPIE (July 01 1990)
Fly-By-Light Sensors
Proceedings of SPIE (March 22 1983)
Precision Long-Range Laser Ranging System
Proceedings of SPIE (September 11 1978)
Photon Counting Reticon System-Description And Performance
Proceedings of SPIE (November 16 1982)

Back to Top