19 July 1999 Update on BAe resistor array design and development
Alan P. Pritchard, Mark D. Balmond, Lucy A. Brimecombe, Stephen Paul Lake, Mark A. Venables, David W. Gough, Michael C. Hebbron, Ian M. Sturland
Author Affiliations +
Abstract
We describe the status of various aspects of BAe resistor array infra-red scene projector systems for hardware-in-the- loop testing. The aspects covered include subsystem development on current 512 X 512 systems; electronic data handling and driver systems, optical projection collimators, heatsink, cooling and environmental gas control systems. Design aspects are sketched for the progression from existing demonstrator arrays of up to 1024 X 1024 into complete systems.
© (1999) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Alan P. Pritchard, Mark D. Balmond, Lucy A. Brimecombe, Stephen Paul Lake, Mark A. Venables, David W. Gough, Michael C. Hebbron, and Ian M. Sturland "Update on BAe resistor array design and development", Proc. SPIE 3697, Technologies for Synthetic Environments: Hardware-in-the-Loop Testing IV, (19 July 1999); https://doi.org/10.1117/12.352926
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Resistors

Heatsinks

Collimators

Control systems

Data storage

Integrated circuit design

Multiplexing

Back to Top