2 August 2000 Experiences with VLT engineering maintenance and support
Author Affiliations +
Abstract
The VLT project considered from its beginning that maintenance was going to be an important issue to support the operation of this large observatory. A special maintenance philosophy and strategy was developed considering as its primary base preventive and predictive maintenance (PM and PdM). This paper describes the basic concepts under the VLT maintenance strategy and how to implement it in practice.
© (2000) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Patricio Ibanez and Nelson Montano "Experiences with VLT engineering maintenance and support", Proc. SPIE 4004, Telescope Structures, Enclosures, Controls, Assembly/Integration/Validation, and Commissioning, (2 August 2000); https://doi.org/10.1117/12.393950
PROCEEDINGS
8 PAGES


SHARE
Advertisement
Advertisement
RELATED CONTENT

LSST communications middleware implementation
Proceedings of SPIE (July 27 2016)
Reliability culture at La Silla Paranal Observatory
Proceedings of SPIE (July 29 2010)
Paranal maintenance and CMMS experience
Proceedings of SPIE (September 28 2004)
A software complex for TNG Observatory efficiency measurements
Proceedings of SPIE (September 13 2012)
Management evolution in the LSST project
Proceedings of SPIE (August 04 2010)

Back to Top