25 July 2000 ESO data flow system in operations: closing the data loop
Peter J. Quinn, Miguel A. Albrecht, Preben Grosbol, Bruno Leibundgut, Michele Peron, David R. Silva
Author Affiliations +
Abstract
On 1 April 1999, the first unit telescope (ANTU) of the ESO VLT began science operations. Two new instruments (FORS-1 for optical imaging and spectroscopy and ISAAC for IR imaging and spectroscopy) were offered in a mix of 50% visitor mode and 50% service mode. A Phase-I and Phase-II proposal and observation preparation process was conducted from 1 October 1998 until the middle of March 1999 involving approximately 280 proposals. A total of 1768 Observation Blocks for 83 approved service mode programs were scheduled and executed between 1 April and 1 October 1999. The resultant raw science and calibration data were subjected to quality control in Garching and released to the ESO user community starting from 15 June 1999 along with pipeline processed data products for a subset of instrument modes. The data flow loop for the first LT telescope is closed. The current operational VLT data flow system and the developments for the remainder of the VLT will be presented in the light of the first year of operational experience.
© (2000) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Peter J. Quinn, Miguel A. Albrecht, Preben Grosbol, Bruno Leibundgut, Michele Peron, and David R. Silva "ESO data flow system in operations: closing the data loop", Proc. SPIE 4010, Observatory Operations to Optimize Scientific Return II, (25 July 2000); https://doi.org/10.1117/12.392510
Lens.org Logo
CITATIONS
Cited by 5 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Calibration

Data archive systems

Telescopes

Observatories

Data storage

Digital video discs

Data processing

RELATED CONTENT

Delivering data reduction pipelines to science users
Proceedings of SPIE (July 11 2016)
VLT service mode operations at seven years
Proceedings of SPIE (June 30 2006)
ESO Archive data and metadata model
Proceedings of SPIE (September 24 2012)
The Chandra X ray Center data system supporting the...
Proceedings of SPIE (June 29 2006)
Korea microlensing telescope network: data management plan
Proceedings of SPIE (September 24 2012)
VISTA data flow system: overview
Proceedings of SPIE (September 16 2004)

Back to Top