Paper
21 February 2003 VLTI auxiliary telescopes: assembly, integration and testing
Carlo Flebus, Pierre Gloesener, Olivier Pirnay, Nathalie M. Ninane, Bertrand Koehler
Author Affiliations +
Abstract
As part of the Very Large Telescope Interferometer (VLTI), ESO signed in June 1998 a contract with AMOS S.A. covering the design, manufacturing and testing of the Auxiliary Telescope System (ATS), including three movable auxiliary telescopes (AT) and the associated site equipment. The project entered into manufacturing phase in mid-1999. As a prime contractor, AMOS S.A. had to deliver complete and fully operational telescopes ready to plug on any of the thirty stations of the VLTI sub-array. This work required an overall system level approach involving a multi-skilled team. This paper depicts the progress status and presents the results of the main tests -- except optical testing -- performed on the telescopes in AMOS facilities. Those tests are the earliest verification of high-level requirement specifications such as optical path length (OPL) stability, pointing error, main axis dynamic response, performed on the telescope fully integrated.
© (2003) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Carlo Flebus, Pierre Gloesener, Olivier Pirnay, Nathalie M. Ninane, and Bertrand Koehler "VLTI auxiliary telescopes: assembly, integration and testing", Proc. SPIE 4838, Interferometry for Optical Astronomy II, (21 February 2003); https://doi.org/10.1117/12.457062
Lens.org Logo
CITATIONS
Cited by 4 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Optical fabrication

Manufacturing

Optical testing

Astronomical imaging

Astronomy

Charge-coupled devices

RELATED CONTENT


Back to Top