Translator Disclaimer
Paper
30 January 2003 Commissioning instrument for the Gran Telescopio Canarias
Author Affiliations +
Abstract
During the GTC integration phase, the Commissioning Instrument (CI) will be a diagnostic tool for performance verification. The CI features four operation modes-imaging, pupil imaging, Curvature WFS, and high resolution Shack-Hartmann WFS. After the GTC Commissioning we also plan to install a Pyramid WFS. This instrument can therefore serve as a test bench for comparing co-phasing methods for ELTs on a real segmented telescope. In this paper we made a general instrument overview.
© (2003) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
PROCEEDINGS
10 PAGES


SHARE
Advertisement
Advertisement
RELATED CONTENT

Progress of the x ray CCD camera development for the...
Proceedings of SPIE (September 26 2013)
PAU camera: detectors characterization
Proceedings of SPIE (September 25 2012)
Recent advances with WYFFOS
Proceedings of SPIE (July 09 1998)
CFHT MegaCam filter, shutter and roll pitch mechanisms
Proceedings of SPIE (March 07 2003)

Back to Top