Paper
3 March 2003 System integration and testing of the SOFIA Telescope
Walter Schubbach, Eberhard Sust, Martin Suess
Author Affiliations +
Abstract
System integration and testing of an airborne telescope like SOFIA is a complex process and needs to be done in three phases: 1. pre-assembling the telescope on ground; 2. integration of the telescope into the aircraft on ground; 3. in-flight commissioning and testing. Due to practical reasons (available time resources, costs) not every item can be fi-nally commissioned and tested under all environmental conditions before flight, and cooperation and joint activities between the aircraft people, the telescope people and the later users is necessary. The paper describes, how the work is shared in the three phases, what experience has been gotten so far and what is planned for the remaining activities.
© (2003) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Walter Schubbach, Eberhard Sust, and Martin Suess "System integration and testing of the SOFIA Telescope", Proc. SPIE 4857, Airborne Telescope Systems II, (3 March 2003); https://doi.org/10.1117/12.458587
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Space telescopes

System integration

Gyroscopes

Observatories

Mirrors

Sensors

RELATED CONTENT

Telescope control system of SOFIA
Proceedings of SPIE (March 03 2003)
Technology for 8-m primary mirrors
Proceedings of SPIE (July 01 1990)
University Of California Ten Meter Telescope Project
Proceedings of SPIE (November 04 1982)
Airborne Infrared Astronomy Telescope
Proceedings of SPIE (September 01 1974)

Back to Top