You have requested a machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Neither SPIE nor the owners and publishers of the content make, and they explicitly disclaim, any express or implied representations or warranties of any kind, including, without limitation, representations and warranties as to the functionality of the translation feature or the accuracy or completeness of the translations.
Translations are not retained in our system. Your use of this feature and the translations is subject to all use restrictions contained in the Terms and Conditions of Use of the SPIE website.
30 September 2004bHROS installation and system performance
The Gemini bHROS instrument, (Bench-Mounted High Resolution Optical Spectrograph) was delivered to the Gemini South Telescope in March 2003, after passing it's onsite acceptance test at UCL (University College London). The instrument was installed through the 2003 period, getting its final components, the fibre system, in September of that year. A number of nights were then allocated to the instrument to verify it throughput.
This paper discusses the installation of the bHROS system in the pier lab and the difficulties encountered getting an accurate measure of the throughput of the system. An overview of the measured performance of the instrument and details of additional, proposed, system enhancements is given and an indication of the timescales for its release to the astronomical community is discussed.
The alert did not successfully save. Please try again later.
Margaret E. Aderin, "bHROS installation and system performance," Proc. SPIE 5492, Ground-based Instrumentation for Astronomy, (30 September 2004); https://doi.org/10.1117/12.550960