Translator Disclaimer
Paper
15 September 2004 Altair interactions
Author Affiliations +
Abstract
Altair, ALTitude-conjugated Adaptive optics for InfraRed at Gemini North, was commissioned last October and is one of Canada’s major contributions to the Gemini Project, a seven-nation consortium that built identical 8m telescopes in Hawaii (Gemini North) and Chile (Gemini South). Altair coordinates and transfers data and status to both local and external subsystems at very high speeds. External Gemini subsystems include the Telescope Control System (TCS), Acquisition and Guiding (A&G), Observatory Control System (OCS), Gemini Interlock System (GIS), Time Server, Data Handling System (DHS), and Status and Alarm Database. This paper focuses on a few select sequences such as closing the control loop and delivering a corrected image, collecting statistics, and display data to highlight the complexity of the interactions within Altair.
© (2004) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Jennifer Dunn, Jean-Pierre Veran, Glen Herriot, and Malcolm Smith "Altair interactions", Proc. SPIE 5496, Advanced Software, Control, and Communication Systems for Astronomy, (15 September 2004); https://doi.org/10.1117/12.552276
PROCEEDINGS
11 PAGES


SHARE
Advertisement
Advertisement
RELATED CONTENT

Ground layer AO correction for the VLT MUSE project
Proceedings of SPIE (October 25 2004)
Implementation of the Altair optimization processes
Proceedings of SPIE (February 07 2003)
Innovations in Gemini adaptive optics system design
Proceedings of SPIE (September 11 1998)
High-contrast imaging testbed
Proceedings of SPIE (February 08 2008)

Back to Top