Translator Disclaimer
Paper
7 July 2008 GeMS: Gemini Mcao System: current status and commissioning plans
Author Affiliations +
Abstract
The Gemini Multi-Conjugate Adaptive Optics project was launched in April 1999 to become the Gemini South AO facility in Chile. The system includes 5 laser guide stars, 3 natural guide stars and 3 deformable mirrors optically conjugated at 0, 4.5 and 9km to achieve near-uniform atmospheric compensation over a 1 arc minute square field of view. Sub-contracted systems with vendors were started as early as October 2001 and were all delivered by July 2007, but for the 50W laser (due around September 2008). The in-house development began in January 2006, and is expected to be completed by the end of 2008 to continue with integration and testing (I&T) on the telescope. The on-sky commissioning phase is scheduled to start during the first half of 2009. In this general overview, we will first describe the status of each subsystem with their major requirements, risk areas and achieved performance. Next we will present our plan to complete the project by reviewing the remaining steps through I&T and commissioning on the telescope, both during day-time and at night-time. Finally, we will summarize some management activities like schedules, resources and conclude with some lessons learned.
© (2008) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
PROCEEDINGS
15 PAGES


SHARE
Advertisement
Advertisement
RELATED CONTENT

Status of the ARGOS project
Proceedings of SPIE (July 21 2014)
The Giant Magellan Telescope adaptive optics program
Proceedings of SPIE (July 21 2014)
Innovations in Gemini adaptive optics system design
Proceedings of SPIE (September 11 1998)
Keck I laser guide star adaptive optics system
Proceedings of SPIE (September 13 2012)
MCAO for Gemini South
Proceedings of SPIE (February 07 2003)
Status of the ARGOS ground layer adaptive optics system
Proceedings of SPIE (September 13 2012)

Back to Top