4 August 2010 Commissioning results from the Large Binocular Telescope
Author Affiliations +
Abstract
While the ultimate proof of telescope performance is in the quality and amount of science it is able to produce, commissioning results give a good and in-depth indication of how well a telescope facility actually performs, both in terms of sub-system commissioning and on-sky commissioning. Results from LBT commissioning activities are presented, along with lessons learned and a discussion of the challenges for future commissioning required to prepare the LBT for true Binocular Operation and ultimately interferometric operations.
© (2010) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Joar G. Brynnel, Norman J. Cushing, Richard F. Green, John M. Hill, Douglas L. Miller, Andrew Rakich, and David Thompson "Commissioning results from the Large Binocular Telescope", Proc. SPIE 7733, Ground-based and Airborne Telescopes III, 77332K (4 August 2010); https://doi.org/10.1117/12.856800
Lens.org Logo
CITATIONS
Cited by 1 scholarly publication.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Stars

Mirrors

Cameras

Active optics

Collimation

Wavefront sensors

RELATED CONTENT

The Large Binocular Telescope: binocular all the time
Proceedings of SPIE (July 10 2014)
Status of the NGS adaptive optic system at the MMT...
Proceedings of SPIE (October 25 2004)
OWL phase A status report
Proceedings of SPIE (September 28 2004)
Commissioning results from the Large Binocular Telescope
Proceedings of SPIE (September 17 2012)

Back to Top