Paper
17 September 2012 Performance introduction of a 2.5m telescope mount
Author Affiliations +
Abstract
In recent years, Nanjing Institute of Astronomical Optics and Technology (NIAOT) has made several telescopes for observatories all around the world. In 2011 NIAOT just finished the development of a 2.5m optical/infrared telescope mount. First part of this paper is to introduce the mount structure and their adjustment work. Second part is to give an introduction of the mount performance test methods and test results finished on NIAOT workshop.
© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Guomin Wang, Bozhong Gu, Shihai Yang, Xiang Jiang, Zhiyong Zhang, Yu Ye, and Jin Xu "Performance introduction of a 2.5m telescope mount", Proc. SPIE 8444, Ground-based and Airborne Telescopes IV, 84443U (17 September 2012); https://doi.org/10.1117/12.925948
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Optical tracking

Telescopes

Mirrors

Astronomical imaging

Computer programming

Control systems

Astronomical telescopes

RELATED CONTENT

Introduction of Chinese SONG Telescope
Proceedings of SPIE (September 17 2012)
The pressure control technology of the active stressed lap
Proceedings of SPIE (October 06 2010)
Introduction of a 2.5m telescope mount and its performance
Proceedings of SPIE (August 05 2010)
Tracking system of LAMOST telescope
Proceedings of SPIE (August 25 1998)
Design of MB sub-mirror handling manipulator for LAMOST
Proceedings of SPIE (July 23 2008)

Back to Top