Paper
15 July 2016 The 4MOST Operations System
Tom Dwelly, Andrea Merloni, Jakob C. Walcher, Nicolas Clerc, Alain Gueguen, Thomas Boller, Roelof S. de Jong, Cristina Chiappini
Author Affiliations +
Abstract
The 4MOST multi-object spectroscopic instrument (to be mounted on the ESO/VISTA telescope) will be used to conduct an ambitious multi-year wide area sky survey. A disparate set of science goals, requiring observation of tens of millions of galactic and extragalactic targets, must be satisfied by a unified program of observations. The 4MOST Operations System is designed to facilitate this complex task by i) providing sophisticated simulation tools that allow the science team to plan and optimise the 4MOST survey, ii) carrying out optimised mediumterm scheduling using survey forecasting tools and feedback from previous observations, and iii) producing sets of observation blocks ready for execution at the telescope. We present an overview of the Operations System, highlighting the advanced facility simulator tool and the novel strategies that will enable 4MOST to achieve its challenging science goals.
© (2016) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Tom Dwelly, Andrea Merloni, Jakob C. Walcher, Nicolas Clerc, Alain Gueguen, Thomas Boller, Roelof S. de Jong, and Cristina Chiappini "The 4MOST Operations System", Proc. SPIE 9910, Observatory Operations: Strategies, Processes, and Systems VI, 99101Q (15 July 2016); https://doi.org/10.1117/12.2231855
Lens.org Logo
CITATIONS
Cited by 1 scholarly publication.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
James Webb Space Telescope

Spectroscopy

Camera shutters

Target acquisition

Sensors

Imaging spectroscopy

Calibration

RELATED CONTENT

EMIR at the GTC results on the commissioning at...
Proceedings of SPIE (August 04 2016)
LUCIFER1 commissioning at the LBT
Proceedings of SPIE (July 15 2010)
JWST planning and scheduling operations and concepts
Proceedings of SPIE (July 29 2010)
The VIMOS upgrade programme
Proceedings of SPIE (September 24 2012)

Back to Top