You have requested a machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Neither SPIE nor the owners and publishers of the content make, and they explicitly disclaim, any express or implied representations or warranties of any kind, including, without limitation, representations and warranties as to the functionality of the translation feature or the accuracy or completeness of the translations.
Translations are not retained in our system. Your use of this feature and the translations is subject to all use restrictions contained in the Terms and Conditions of Use of the SPIE website.
15 August 2016Requirements management for Gemini Observatory: a small organization with big development projects
Gemini Observatory is an astronomical observatory operating two premier 8m-class telescopes, one in each hemisphere. As an operational facility, a majority of Gemini’s resources are spent on operations however the observatory undertakes major development projects as well. Current projects include new facility science instruments, an operational paradigm shift to full remote operations, and new operations tools for planning, configuration and change control. Three years ago, Gemini determined that a specialized requirements management tool was needed. Over the next year, the Gemini Systems Engineering Group investigated several tools, selected one for a trial period and configured it for use. Configuration activities including definition of systems engineering processes, development of a requirements framework, and assignment of project roles to tool roles. Test projects were implemented in the tool. At the conclusion of the trial, the group determined that the Gemini could meet its requirements management needs without use of a specialized requirements management tool, and the group identified a number of lessons learned which are described in the last major section of this paper. These lessons learned include how to conduct an organizational needs analysis prior to pursuing a tool; caveats concerning tool criteria and the selection process; the prerequisites and sequence of activities necessary to achieve an optimum configuration of the tool; the need for adequate staff resources and staff training; and a special note regarding organizations in transition and archiving of requirements.
The alert did not successfully save. Please try again later.
Madeline Close, Andrew Serio, Martin Cordova, Kayla Hardie, "Requirements management for Gemini Observatory: a small organization with big development projects," Proc. SPIE 9911, Modeling, Systems Engineering, and Project Management for Astronomy VII, 99111G (15 August 2016); https://doi.org/10.1117/12.2230853