Presentation + Paper
29 August 2022 M1 Assembly for the EST: selection of the most promising baseline configuration for the preliminary design
Angel Mato, Nauzet Vega, Mahy Soler, Juan Cozar-Castellano, Jose M. Gonzalez-Cava, Miguel Núñez Cagigal, Jorge Sánchez-Capuchino, Mary Barreto, Albert Tomàs, Marc Crusells, Erik Escalera, Miguel Redondo, Joan Manel Casalta, Albert Nieto
Author Affiliations +
Abstract
The European Solar Telescope (EST) is a 4-m class solar telescope that will be installed at the Observatorio del Roque de los Muchachos in La Palma (Spain). Two important factors make EST different from other similar size telescopes: high thermal load due to solar radiation and open dome configuration during observation. Therefore, the entire telescope will be exposed to direct and indirect solar radiation, which requires a very demanding thermal management in order to minimize local seeing. In addition, the complete telescope will be exposed to wind, which has an important impact both in image stability and image quality. The EST M1 Assembly (primary mirror and cell) will have to cope with these critical issues, apart from other aspects common to primary mirrors of similar size. In 2020, in the scope of the EST Preliminary Design Phase, the development of the M1 Assembly was granted to the company SENER-Aeroespacial. The first step, before starting the design, was to evaluate different technologies and configurations for the following critical aspects: mirror (lightweight or not), number and type of axial actuators, cooling system, and number of interfaces with the elevation tube. A comparative study was carried out in order to define the baseline configuration for the M1 Assembly. This baseline configuration was then fully developed up to preliminary design level. This paper addresses the comparative study performed for selecting the most promising baseline configuration for the EST M1 Assembly.
Conference Presentation
© (2022) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Angel Mato, Nauzet Vega, Mahy Soler, Juan Cozar-Castellano, Jose M. Gonzalez-Cava, Miguel Núñez Cagigal, Jorge Sánchez-Capuchino, Mary Barreto, Albert Tomàs, Marc Crusells, Erik Escalera, Miguel Redondo, Joan Manel Casalta, and Albert Nieto "M1 Assembly for the EST: selection of the most promising baseline configuration for the preliminary design", Proc. SPIE 12188, Advances in Optical and Mechanical Technologies for Telescopes and Instrumentation V, 121880C (29 August 2022); https://doi.org/10.1117/12.2628568
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Mirrors

Actuators

Telescopes

Interfaces

Active optics

Optical calibration

Optical instrument design

Back to Top