Paper
25 August 1993 ASTER instrument calibration plan
Akira Ono, Fumihiro Sakuma
Author Affiliations +
Abstract
ASTER is composed of three radiometers for separate wavelength regions: visible and near infrared radiometer (VNIR) and short wavelength infrared radiometer (SWIR) both in the solar reflection region, and thermal infrared radiometer (TIR) in the thermal emission region. Each radiometer will be calibrated before launch on the ground, and after launch in orbit. This paper describes the calibration plan of ASTER radiometer.
© (1993) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Akira Ono and Fumihiro Sakuma "ASTER instrument calibration plan", Proc. SPIE 1939, Sensor Systems for the Early Earth Observing System Platforms, (25 August 1993); https://doi.org/10.1117/12.152847
Lens.org Logo
CITATIONS
Cited by 6 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Calibration

Black bodies

Short wave infrared radiation

Radiometry

Lamps

Mirrors

Temperature metrology

RELATED CONTENT

ASTER on-board calibration status
Proceedings of SPIE (October 09 2008)
ASTER on-board calibration status
Proceedings of SPIE (April 08 2003)
ASTER calibration concept
Proceedings of SPIE (August 01 1991)
Radiometric calibration techniques for ASTER
Proceedings of SPIE (January 09 1995)

Back to Top