Paper
8 July 2002 Capacity upgrade for already-installed undersea cable system combined with advanced network configuration
Hidenori Taga, Yuichi Yamada, Hiroshi Yamauchi, Eiichi Shibano, Koji Goto
Author Affiliations +
Proceedings Volume 4872, Optical Transmission Systems and Equipment for WDM Networking; (2002) https://doi.org/10.1117/12.475111
Event: ITCom 2002: The Convergence of Information Technologies and Communications, 2002, Boston, MA, United States
Abstract
Capacity upgrade of already installed undersea cable system is attractive from the cost point of view. Advanced technologies such as powerful forward error correction support this upgrade. In this paper, we demonstrate a system capacity upgrade beyond the designed limitation experimentally using the advanced technologies. As a result, a possibility to triple the designed capacity of trans-Atlantic system is shown. In addition, we propose a configuration to improve the transmission efficiency of the network combined with the expansion of the already installed undersea cable system.
© (2002) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Hidenori Taga, Yuichi Yamada, Hiroshi Yamauchi, Eiichi Shibano, and Koji Goto "Capacity upgrade for already-installed undersea cable system combined with advanced network configuration", Proc. SPIE 4872, Optical Transmission Systems and Equipment for WDM Networking, (8 July 2002); https://doi.org/10.1117/12.475111
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Forward error correction

Modulation

Vestigial sideband modulation

Wavelength division multiplexing

Dispersion

Modulators

Phase modulation

RELATED CONTENT


Back to Top