As of July 2012, the Large Binocular Telescope Observatory is supporting scientific observing 60% of the time with binocular prime focus imaging, single-sided optical and near-IR imaging and spectroscopy, and adaptive optics imaging. Interspersed in the last year were installation and commissioning of the second adaptive optics system and recommissioning of the LUCI near-IR instrument with a replacement detector. Initial commissioning of mid-IR interferometry is underway as well. We examine the lost time statistics and distribution of issues that reduced on-sky access in the context of the limited technical support provided for observing. We discuss some of the root causes of and responses to a critical operational readiness review. The manner in which programs are selected and scheduled for the different partners is reviewed. The goal is to apply the lessons learned to the continuing period of observation plus commissioning anticipated as new spectroscopic, adaptive optics, and interferometric capabilities are added through 2015.
© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Richard F. Green, John M. Hill, Joar Brynnel, James H. Slagle, David S. Ashby, Norman J. Cushing, John K. Little, and R. Mark Wagner "Mixing completion, commissioning, and operations at the LBT", Proc. SPIE 8448, Observatory Operations: Strategies, Processes, and Systems IV, 844815 (13 September 2012); https://doi.org/10.1117/12.927272
Lens.org Logo
CITATIONS
Cited by 1 scholarly publication.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Adaptive optics

Observatories

Cameras

Spectrographs

Imaging spectroscopy

Sensors

RELATED CONTENT

LBTO's long march to full operation - step 1
Proceedings of SPIE (August 06 2014)
Instrumentation at the Keck Observatory
Proceedings of SPIE (March 07 2003)
Instrumentation for the Keck Observatory
Proceedings of SPIE (August 16 2000)

Back to Top