The Magdalena Ridge Observatory Interferometer (MROI) has completed its design phase and is currently in the construction phase. The first telescope will be deployed at the MROI site in 2011. Five different vendors are involved in the design and fabrication of a unit telescope, and a much larger number for the full observatory. This paper addresses the steps that the MRO Interferometry project will undertake to integrate subsystems developed by different parties, through commissioning into an operational optical interferometer. Finally we present the commissioning plan to bring the interferometer to an operational mode. We have developed "performance verification milestones" that successively increase the "science readiness" of the interferometer and transitions to an operational phase.
© (2010) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Eric Bakker, Andres Olivares, Fernando Santoro, Ifan Payne, Rob Selina, Dan Klinglesmith III, Allen Farris, Ron King, Colby Jurgenson, John Seamons, Nicolas Torres, Michelle Creech-Eakman, and Krista McCord "Assembly and integration activities moving toward commissioning of the Magdalena Ridge Observatory Interferometer", Proc. SPIE 7734, Optical and Infrared Interferometry II, 77340V (21 July 2010); https://doi.org/10.1117/12.856468
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Interferometers

Optical instrument design

Magdalena Ridge Observatory

Space telescopes

Mirrors

Observatories

RELATED CONTENT


Back to Top