24 July 2014 Making the CHARA Array, Part II: project management: 15 years on thin ice
Author Affiliations +
Abstract
The reviewers of our first NSF proposal asked us to prepare a more ambitious plan, and we did. When it was funded, the scope of the resources made available was far below the scope of the project. What to do? The only way to proceed within budget was to eliminate the entire professional engineering component of the proposal team, and we did so. This left the CHARA staff and a few consultants. The story of building the CHARA Array is largely the story of how to build a facility and instrument with no engineers, no managers, and no meetings. How was this possible?
© (2014) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Stephen T. Ridgway, Theo A. ten Brummelaar, and Harold A. McAlister "Making the CHARA Array, Part II: project management: 15 years on thin ice", Proc. SPIE 9146, Optical and Infrared Interferometry IV, 91460E (24 July 2014); https://doi.org/10.1117/12.2056748
Lens.org Logo
CITATIONS
Cited by 1 scholarly publication.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Interferometry

Mirrors

Space telescopes

Astronomy

Interferometers

Prototyping

Back to Top