MICADO is the ELT first light instrument, an imager working at the diffraction limit of the telescope thanks to two adaptive optics (AO) modes: a single conjugate one (SCAO), available at the instrument first light and developed by the MICADO consortium, and a multi conjugate one (MCAO), developed by the MORFEO consortium. Although the project final design review process is about to be completed, the review board and ESO acknowledged that "the review of the final design can be considered complete for the majority of the MICADO sub-systems" and agreed that MICADO can start manufacturing. For the MICADO SCAO module, we have started the manufacturing of several parts: the majority of the SCAO optics and of the SCAO mechanics, the real-time computer software and the instrument control software. This manufacturing is ordered in several steps to allow the progressive integration of a first full AO close loop with the final SCAO parts. In this contribution, we will focus on the first two steps: on our AO Sésame bench and the so-called "β flat configuration". We will present the status of this manufacturing and the first results obtained.
MICADO is a first light instrument for the Extremely Large Telescope (ELT), set to start operating later this decade. It will provide diffraction limited imaging, astrometry, high contrast imaging, and long slit spectroscopy at near-infrared wavelengths. During the initial phase operations, adaptive optics (AO) correction will be provided by its own natural guide star wavefront sensor. In its final configuration, that AO system will be retained and complemented by the laser guide star multi-conjugate adaptive optics module MORFEO (formerly known as MAORY). Among many other things, MICADO will study exoplanets, distant galaxies and stars, and investigate black holes, such as Sagittarius A* at the centre of the Milky Way. After their final design phase, most components of MICADO have moved on to the manufacturing and assembly phase. Here we summarize the final design of the instrument and provide an overview about its current manufacturing status and the timeline. Some lessons learned from the final design review process will be presented in order to help future instrumentation projects to cope with the challenges arising from the substantial differences between projects for 8-10m class telescopes (e.g. ESO’s VLT) and the next generation Extremely Large Telescopes (e.g. ESO’s ELT). Finally, MICADO's expected performance will be discussed in the context of the current landscape of astronomical observatories and instruments. For instance, MICADO will have similar sensitivity as the James Webb Space Telescope (JWST), but with six times the spatial resolution.
MICADO is the ELT first light instrument, an imager working at the diffraction limit of the telescope thanks to two adaptive optics (AO) modes: a single conjugate one (SCAO), available at the instrument first light and developed by the MICADO consortium, and a multi conjugate one (MCAO), developed by the MORFEO consortium.
This contribution presents an overview of the SCAO module while MICADO and its SCAO are in the last phase of their final design review. We focus on the SCAO architecture choices and present the final design of the SCAO subsystems: the Green Doughnut structure, the SCAO wavefront sensor, the SCAO calibration unit, the SCAO ICS (i.e. AOCS) and the SCAO RTC. We also present the SCAO global performance in terms of AO correction, obtained from an error budget that includes contributors estimated from AO end-to-end simulations as well as instrumental contributors. Finally, we present the current SCAO subsystems prototyping and the main milestones of the SCAO AIT plan.
MSE will be a massively multiplexed survey telescope, including a segmented primary mirror which feeds fibers at the prime focus, including an array of approximately four thousand fibers, positioned precisely to feed banks of spectrographs several tens of meters away.
We describe the process of mapping top-level requirements on MSE to technical specifications for subsystems located at the MSE prime focus. This includes the overall top-level requirements based on knowledge of similar systems at other telescopes and how those requirements were converted into specifications so that the subsystems could begin working on their Conceptual Design Phases. We then discuss the verification of the engineering specifications and the compiling of lower-level requirements and specifications into higher level performance budgets (e.g. Image Quality). We also briefly discuss the interface specifications, their effect on the performance of the system and the plan to manage them going forward. We also discuss the opto-mechanical design of the telescope top end assembly and refer readers to more details for instrumentation located at the top end.
Access to the requested content is limited to institutions that have purchased or subscribe to SPIE eBooks.
You are receiving this notice because your organization may not have SPIE eBooks access.*
*Shibboleth/Open Athens users─please
sign in
to access your institution's subscriptions.
To obtain this item, you may purchase the complete book in print or electronic format on
SPIE.org.
INSTITUTIONAL Select your institution to access the SPIE Digital Library.
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.